The "pit" is the complete building, no parking. The footprint is close to 60,000 sq.ft, and the building will be two floors below grade, except at the south end, where the bulding will come out of the ground 1 and then 2 floors as it follows the slope up to the Prospect end of the stadium near I-House.

The pit will be 40' deep in some areas. The soil is being removed and taken directly to another site by the contractor who has another job where the fill was needed.