Please elaborate... - 02-11-2010, 02:34 PM

Quote:
Originally Posted by jankoski View Post
There's better pics from the Construction Insider via Calfan's OP. I'm a little surprised that the walls of the SAHPC against Memorial Stadium haven't been poured, yet, while they're preparing the 2nd floor pour on the far south-side (photo 102).
I'm not a structural engineer, but it seems to me that what you're seeing in Photo 102 is a surface to walk on, nothing more.

***************

I talked to a structural engineers and asked him to comment on the photos. He agreed with me that the rebar on the left hand side of Photo 102 is for the wall next to (but separate from) the Stadium. He also said that based on other photos (see Photo 84, for instance), it's certain that the wall for the first floor was poured all the way around the perimeter. That would include the wall adjacent to (but separaate from) the Stadium.
Reply With Quote
  (#77) Old
jankoski jankoski is offline
Loyal Bear
 
jankoski's Avatar
 
Posts: 3,127
Join Date: Jul 2008
Location: Walnut Creek, CA
02-11-2010, 06:39 PM

Quote:
Originally Posted by DavidDempster View Post
I'm not a structural engineer, but it seems to me that what you're seeing in Photo 102 is a surface to walk on, nothing more.

***************

I talked to a structural engineers and asked him to comment on the photos. He agreed with me that the rebar on the left hand side of Photo 102 is for the wall next to (but separate from) the Stadium. He also said that based on other photos (see Photo 84, for instance), it's certain that the wall for the first floor was poured all the way around the perimeter. That would include the wall adjacent to (but separaate from) the Stadium.
I'm a molecular biologist, so who am I to debate an engineer? I do know they poured a retaining wall around the site, but Pic 97 shows naked rebar to the ground floor of the SAHPC. I believe that rebar represents the walls of the SAHPC against Memorial. In addition, the rebar hasn't been placed at the last ramp into the site near the International house.

On your question about the walkways, I did watch the building of the parking garage at the PH Bart Station where they used the same technique of scaffoling and wood to pour cement for the levels above the ground level. I was at the site, today, and that's exactly what they're doing. The entire scaffolding area in pic 102 is covered with wood, and they are placing rebar onto it. I promise to furnish pics next thursday, when I'll be on campus, again.
Reply With Quote
  (#78) Old
Scottski51 Scottski51 is offline
Real Bear
 
Scottski51's Avatar
 
Posts: 2,332
Join Date: Jul 2008
Location: Clovis, Ca.
02-15-2010, 11:12 AM

thanks for the pictures jankowski. Great stuff.
Layman's thoughts:
Assume but hope these are all Union jobs.
Loved the CAL logo on safety vests...are those on Univ employees? Or just coincidence??
Anyone know if a video documentary is being made of this WHOLE process (yes, including our friendly treesitters)? IMO, it would make a great 2 hr. show for now and in the years to come.
Just by the amount of rebar visible (is this normal these days??) the place looks to be virtually bomb-proof, much less quake resistant!
Thanks again and Go BEARS!!
Reply With Quote
  (#79) Old
jankoski jankoski is offline
Loyal Bear
 
jankoski's Avatar
 
Posts: 3,127
Join Date: Jul 2008
Location: Walnut Creek, CA
02-18-2010, 06:33 PM

New pics of the SAHPC construction site on this foggy day! The proof is in the pudding, Mr. Dempster...



The construction is obviously moving forward at light speed, as the 2nd level was poured near the I-house during the week.







The following pic is looking back at the 2nd floor from the north-side of the Press box. It also shows the first floor is now complete.



There were multiple crews working on installing rebar.



There's one of the cameras that will never be used for our viewing pleasure.





Of course, this is a blind inference, but I believe the next pics show of a sloped meeting/lecture room. The flat wet area, clearly seen in the 2nd and 3rd pic, is the bottom of the room, and steps are visible in both pics, too. I could see Tedford laying out the plans to his teams for the Rose Bowl.







More scaffoling was being built for the 2nd floor on the north-side. The red arm is pouring cement for a wall.





Reply With Quote
  (#80) Old
Cal_Fan2 Cal_Fan2 is offline
True Blue Golden Bear
 
Cal_Fan2's Avatar
 
Posts: 15,664
Join Date: Jul 2008
Location: East Bay, Ca...
02-18-2010, 07:37 PM

thanks for the new pics Jankoski....what a beautiful site....
Reply With Quote
  (#81) Old
petalumabear petalumabear is online now
Loyal Bear
 
petalumabear's Avatar
 
Posts: 4,502
Join Date: Jul 2008
Location: Petaluma, Ca.
02-18-2010, 07:48 PM

so true....
Reply With Quote
  (#82) Old
OneTopOneChickenApple OneTopOneChickenApple is online now
Real Bear
 
Posts: 1,707
Join Date: Jul 2008
02-19-2010, 07:49 AM

Wow, awesome. Does anyone know if construction is on schedule?
Reply With Quote
  (#83) Old
Cal_Fan2 Cal_Fan2 is offline
True Blue Golden Bear
 
Cal_Fan2's Avatar
 
Posts: 15,664
Join Date: Jul 2008
Location: East Bay, Ca...
02-19-2010, 11:19 AM

Quote:
Originally Posted by OneTopOneChickenApple View Post
Wow, awesome. Does anyone know if construction is on schedule?
I believe in Okanes chat with Sandy B. yesterday she said that everything is on schedule....
Reply With Quote
  (#84) Old
RoseBowlOski RoseBowlOski is offline
Real Bear
 
RoseBowlOski's Avatar
 
Posts: 656
Join Date: Jul 2008
Location: El Dorado Hills, Ca
02-26-2010, 11:32 AM

Beautiful pictures... sure is exciting, just hope the woman's restrooms are coming along this nicely... would sure make my wife happy when attending games with me..

Go Bears
Reply With Quote
  (#85) Old
LodeBear LodeBear is offline
Real Bear
 
Posts: 804
Join Date: Jul 2008
02-27-2010, 09:11 AM

thanks jankoski for the updated pics. to physically see the SAHPC going up. the recruits know it will be ready by the time they get to cal. go bears!!!

Last edited by LodeBear; 03-09-2010 at 07:48 PM.
Reply With Quote
  (#86) Old
bonsallbear bonsallbear is offline
Real Bear
 
bonsallbear's Avatar
 
Posts: 686
Join Date: Jan 2009
Location: Fallbrook, CA
03-19-2010, 07:31 AM

Quote:
Originally Posted by Scottski51 View Post
thanks for the pictures jankowski. Great stuff.
Layman's thoughts:
Assume but hope these are all Union jobs.
Loved the CAL logo on safety vests...are those on Univ employees? Or just coincidence??
Anyone know if a video documentary is being made of this WHOLE process (yes, including our friendly treesitters)? IMO, it would make a great 2 hr. show for now and in the years to come.
Just by the amount of rebar visible (is this normal these days??) the place looks to be virtually bomb-proof, much less quake resistant!
Thanks again and Go BEARS!!
???? Why ???? Does that matter? Anyway you look at it, it's creating jobs!
Reply With Quote
  (#87) Old
drunkoski drunkoski is offline
no bear
 
Posts: 21,630
Join Date: Jul 2008
Location: Los Angeles
03-19-2010, 08:36 AM

he wants it to go overbudget?
Reply With Quote
  (#88) Old
barabbas barabbas is offline
Loyal Bear
 
barabbas's Avatar
 
Posts: 2,900
Join Date: Jul 2008
Location: Puerto Plata, DR
03-20-2010, 10:33 PM

Quote:
Originally Posted by Scottski51 View Post
Assume but hope these are all Union jobs.
Why? You like be blackmailed while paying retail plus 40%!
Reply With Quote
  (#89) Old
68great 68great is offline
Golden Bear
 
Posts: 5,206
Join Date: Jul 2008
03-22-2010, 01:18 PM

Quote:
Originally Posted by barabbas View Post
Why? You like be blackmailed while paying retail plus 40%!
No but I would want to make sure that the employees are paid a fair wage and that everything is up to code.

Maybe you would prefer it if the contractors building the the SAHPC pick up their workers on the street corner's across from Truitt and White in West Berkeley. Pay them next to nothing and provide no OSHA protections.

Hey to save even more money maybe we could follow the building procedures common in certain foreign countries which ignore earthquake precautions.

Unions -- the people who brought you the Weekend.
Reply With Quote
  (#90) Old
jankoski jankoski is offline
Loyal Bear
 
jankoski's Avatar
 
Posts: 3,127
Join Date: Jul 2008
Location: Walnut Creek, CA
03-22-2010, 09:19 PM

The fact is that there are companies on the project with Spanish-speaking workers. Care to wager that they are not American citizens? At any rate, Obama only cares about bringing down our Capitalist System, not securing our borders, so this argument is ridiculous at least for the next 3 years. Back to the topic of this thread!
Reply With Quote
Reply

Thread Tools
Display Modes

Forum Jump




Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
vBulletin Skin developed by: vBStyles.com
Ad Management by RedTyger